Concrete Washout Station for Your Job Site

CleanSite sets up your washout station: a watertight container or pan we deliver and haul away full.

  • EPA, NPDES and BMP compliant
  • Delivery, pick-up and disposal handled
  • Containers and pans from 1.5 to 9 cubic yards

What a concrete washout station is

On a job site, the washout station is where the trucks rinse their chutes after the pour. It’s part of the site’s waste management: a dug pit, a concrete washout system you buy, or a container.

Ours is a steel, watertight container. There’s no pit to dig, and nothing to dig out at the end.

Sizes

Pick the station size

Orange CleanSite concrete washout container with the 845-781-4-PAN phone number on the side
Container
9yd³
1,700 gallons
Large sites and heavy pour schedules
Container
6yd³
1,200 gallons
Steady truck traffic, multi-day pours
Pan
2.5yd³
475 gallons
Most ready-mix pours
Pan
1.5yd³
300 gallons
Tight sites, single pours, under a pump hopper

Call with the expected yardage and we’ll size it. Compare them on concrete washout containers.

Ready-mix trucks and the pump

  • The pump: only the 1.5 yard pan goes under the pump hopper.
  • Ready-mix trucks: they rinse into their own container.

So we set up both.

How the station gets set up and taken away

CleanSite truck setting a concrete washout container down on a job site
Step 1

We deliver the container

We set it where your trucks can reach it. The small pans fit tight spots, and the 1.5 yard pan slides under a pump truck hopper.

Ready-mix truck washing its chute out into a CleanSite concrete washout container
Step 2

Your trucks wash out

Ready-mix drivers rinse their chutes into the container and pump operators empty the hopper into the pump pan. The washout stays contained and off the ground.

CleanSite truck picking up a concrete washout container from a job site
Step 3

We haul it away

When it’s getting full, call us. We pick it up, take it off site and handle the disposal.

Need a swap? We bring an empty one when we take the full one.

The rule

What the stormwater rule asks

Under EPA’s construction stormwater permit, wash water goes into a leak-proof container or lined pit, and it can’t enter storm drains or waterways.

If your SWPPP calls for washout containment, a watertight container is one way to provide it.

Source: EPA 2022 Construction General Permit, part 2.3.4.

What to have ready when you call

  • The job site address or ZIP
  • The pour date
  • Ready-mix trucks, a pump, or both
  • The expected yardage

Call 845-781-4-PAN or request a container below. We deliver to job sites in NY, NJ, CT and PA. See all service areas.

Questions

Washout station FAQ

Do I have to build a concrete washout station?

No. We bring the container, and we haul it away full.

Get a container on site

Request a concrete washout container

Tell us the jobsite, the pour date, the expected yardage and whether you have ready-mix trucks, a pump or both. We will match the size and set up delivery.

Send us your job details

We’ll call you back with a container size and delivery time. In a hurry? Call 845-781-4-PAN.